Back to portfolio

P19 / industrial delivery / deployed

Engineering Project Delivery at PetroEcuador

PMI-aligned feasibility, engineering coordination and technical documentation improved project workflow and software cost.

2020EP PetroEcuador, Ecuador
FIELD ENGINEERING DELIVERYEngineering Project Delivery at PetroEcuador
01FIELD NEEDsafety / reliability / throughput
02ENGINEERINGrequirements / design / feasibility
03INTEGRATIONmechanical / electrical / control
04COMMISSIONconfiguration / testing / troubleshooting
05IMPROVEperformance / response / cost

A traceable path from operational need to deployed system performance.

01

Problem or Industrial Need

Engineering initiatives required stronger definition, feasibility control, coordination and documentation across project phases.

02

Engineering or Scientific Solution

A PMI-aligned delivery process connecting initiation, planning, pre-feasibility, feasibility and engineering documentation.

03

Sebastian's Technical Contribution

Managed project definition, feasibility assessment, engineering coordination and technical documentation while identifying more efficient software solutions.

04

Methods and Tools Used

  • PMI project lifecycle
  • Pre-feasibility and feasibility assessment
  • Conceptual and basic engineering coordination
  • Software and resource optimization
05

Prototype, Simulation and Experimental Evidence

deployment

Operational project workflow

The structured process was applied to active engineering-project delivery.

06

Measurable Result or Published Finding

30%

reported workflow improvement

Project coordination improved conceptual, basic and detail-engineering workflow.

20%

reported software-cost reduction

More efficient software choices reduced project expenditure.

07

Diagrams and Publications

FIELD ENGINEERING DELIVERYEngineering Project Delivery at PetroEcuador
01FIELD NEEDsafety / reliability / throughput
02ENGINEERINGrequirements / design / feasibility
03INTEGRATIONmechanical / electrical / control
04COMMISSIONconfiguration / testing / troubleshooting
05IMPROVEperformance / response / cost

A traceable path from operational need to deployed system performance.

08

Role, Team Attribution, Institution and Project Context

Project Manager; EP PetroEcuador, January-June 2020.

Connected work

P122018-2019

Oil-Tank Fire-System Architecture

Problem
Oil-storage fire protection requires coordinated engineering across hazard definition, physical behaviour, mechanical layout and system response.
Solution
A complete engineering architecture developed at MSc level to connect requirements, physical modelling and integrated safety subsystems.
Evidence / result
Integrated safety architecture
system architectureANSYS CFDSolidWorkssafety engineering
View system
P132024-2026

Multidisciplinary Mechatronics Project Development

Problem
Multidisciplinary student engineering requires a repeatable path from requirements and models to working prototypes and defensible validation.
Solution
A hybrid project-development framework combining conventional engineering control, Agile practices, technical gates and ABET-aligned outcomes.
Evidence / result
35 multidisciplinary projects coordinated
hybrid deliveryABETprototypingtechnical supervision
View system
P142025-2026

NVIDIA Digital Twins, Simulation and Physical AI

Problem
Engineering education and prototype development needed a shared simulation-to-embedded stack for robotics, digital twins and AI-enabled systems.
Solution
Deployment of NVIDIA Omniverse, Isaac Sim and Jetson across simulation, workshops, supervised projects and collaboration as the first official NVIDIA University Ambassador in Ecuador.
Evidence / result
3 NVIDIA platforms deployed
OmniverseIsaac SimJetsondigital twins
View system